Demo workspace Synthetic data. Changes last for this session; calls and AI are not connected.Connect your company

Video visits

Get eyes on the job. Keep every detail together.

All visits3

Good evidence makes a better estimate.
Capture details while you’re looking at them.

Completed walkthrough

Garage workshop upgrade

Jordan Ellis/Example property · Garage

Synthetic camera preview. No device access.
Saved report
PDF
All raw downloads & individual files

Downloads & raw files

Download all photos, audio, or transcript at once, or save individual items.

Pictures1 saved
Audio recording1:28 · 2 part(s)
Transcript66 words
Northline Home ServicesWalkthrough report

A more useful garage workshop

Prepared for Jordan Ellis

Jordan would like a dedicated workbench and brighter task lighting along the garage wall. The walkthrough established the preferred work area and the intention to retain existing overhead storage. Dimensions and the existing supply still need to be checked before the work can be priced.

Key moments

  1. 0:12

    Request Customer · Asked for a workbench along the rear wall with brighter light above it.

    We want a workbench along this wall
    Illustrated sample of the proposed workshop area. Synthetic demo evidence.
  2. 0:31

    Request Customer · Wants receptacles at the bench for a saw and battery chargers.

    a few outlets on the bench
  3. 0:48

    Scope Estimator · Proposed extending the existing garage circuit for the bench receptacles.

    tie into the existing garage circuit
  4. 1:05

    Follow-up Estimator · Bench length and the existing supply must be verified before pricing.

  5. 1:22

    Decision Customer · Keep the overhead storage.

    Keep the overhead storage if possible.
    Illustrated sample of the proposed workshop area. Synthetic demo evidence.

Workbench receptacles and task lighting0:12 · 0:31 · 0:48 · 1:05 · 1:22

A work area along the rear wall with task lighting and bench-height receptacles. The proposed location sits below the existing storage. Bench length, fixture selection and the existing circuit were not confirmed.

Customer wants
Customer (0:12, 0:31): a workbench with brighter light above it and several receptacles at the bench for a saw and chargers; keep the overhead storage (1:22).
Estimator said
Estimator (0:48): extend the existing garage circuit for the bench receptacles. (1:05): measure the bench and verify the supply before pricing.
AI notes
AI analysis: a saw and chargers on a shared garage circuit may overload it; a dedicated 20 A circuit is likely the better scope. New garage receptacles need GFCI protection. Confirm lighting clearances below the storage.
Illustrated sample of the proposed workshop area. Synthetic demo evidence.
Illustrated sample of the proposed workshop area. Synthetic demo evidence.

Code & safety review AI

Possible missed requirementNEC 210.8(A)(2) · verify0:48

Estimator said the bench receptacles can tie into the existing garage circuit (0:48); GFCI protection was not discussed.

Garage receptacles at a dwelling generally require GFCI protection, so new bench receptacles would need a GFCI device or breaker.

Evidence: Transcript 0:31 and 0:48. The existing protection is not visible in the photo.

Estimate impact: Add a GFCI receptacle or GFCI breaker for the bench circuit.

Verify: Check whether the existing garage circuit is already GFCI-protected and confirm the adopted code edition.

Reference: NEC 210.8(A) GFCI in dwelling units (NFPA 70, 2023 edition). Dwelling-unit 125-250 V receptacles on single-phase branch circuits of 150 V or less to ground need GFCI protection in bathrooms, garages and accessory buildings, outdoors, crawl spaces, basements, kitchens, within 6 ft of sinks, bathtubs or showers, laundry areas, boathouses and indoor damp or wet locations.

Illustrated sample of the proposed workshop area. Synthetic demo evidence.
Needs verificationNEC 210.11(C)(4) · verify0:48

Extending the existing garage circuit for a saw and chargers (0:48).

Garage receptacle circuits have specific rules, and a saw plus chargers may exceed what the shared circuit can carry. A dedicated 20 A circuit may be needed.

Evidence: Customer described the intended loads at 0:31; the circuit size and other loads were not checked.

Estimate impact: Possible new 20 A branch circuit from the panel instead of an extension.

Verify: Identify the existing garage circuit, its breaker size and the other loads it serves.

Reference: NEC 210.11(C) Required dwelling branch circuits (NFPA 70, 2023 edition). Dwellings need at least two 20 A small-appliance circuits for kitchen/dining receptacles, a 20 A laundry circuit, a 20 A bathroom receptacle circuit, and a 20 A circuit for garage receptacles (with limited other outlets permitted).

  • Synthetic demo review. No AI processing occurred and no code compliance is implied.

AI insights AI

  • Consider switched task lighting with the switch at the bench end, and confirm fixture clearance below the overhead storage.
  • Ask whether the customer plans to charge an EV in this garage; it affects whether a panel load calculation is worth doing now.

What we know

  • Preferred workbench location identified
  • Customer wants to keep overhead storage

Still to confirm

  • Workbench length and installation height
  • Existing garage circuit, breaker size and GFCI protection
  • Fixture selection

Decisions

  • Customer asked to retain overhead storage.

Questions for the next conversation

  • What will you use the workbench for?
  • Do you have preferred fixtures or should we propose options?

Assumptions to verify

  • Final layout is subject to measurements and an on-site verification.

For the estimate draft

Scope task lighting over the proposed workbench and bench-height GFCI-protected receptacles, likely on a dedicated 20 A circuit. Confirm dimensions and existing supply. Retain overhead storage where practical.

Customer-ready summary

We reviewed your workshop plans and the preferred location for the workbench and lighting. Next, we’ll confirm measurements and the existing supply to prepare your estimate.